• Topographic and Surveying for the ShafaBadran sewage project -2019.
• Topographic and surveying for Al-Gor , 150 km,2016.
• Topographic and surveying for Al-Wallah -Madaba, 2016.
• Almafraq Sewer System with 125km length,at 2015.
• Topographic and Surveying for Al-Salt Purification Station 2018.
• South Amman and Zarqa Sewerage Project (AZ BUILT for existing manholes), 2024